IndustrialSource
  • 48+Locations covered
  • Heavy equipment & industrial suppliesFocus
  • One message, no obligationHow it works

2000kVA FG Wilson Generator 50Hz/60Hz for Sale in Warri

2000kVA is 1600 kW of usable power, and a FG Wilson diesel set at this rating is a major purchase in Warri, so the frequency, duty rating and delivery route need to be settled before you pay.

Industrial diesel generator set in an outdoor enclosure
Verified Supplier Network

We do not publish a single price for a 2000kVA FG Wilson, because it swings with frequency, condition, canopy and the exchange rate. Send your specification and we will connect you with suppliers who can quote for Warri.

Warri sits in the Niger Delta oil and gas belt, so demand comes from oil service yards, marine logistics, onshore flow stations and petrochemical sites.

Get an Accurate Quote

Share these details on WhatsApp and we'll match you with the right supplier faster.

  1. Frequency: 50Hz or 60Hz, and voltage
  2. Fuel: diesel, or diesel with a gas option
  3. Prime power or standby duty
  4. Onshore or offshore installation
  5. Open set, soundproof canopy or containerised
  6. New or fairly used, and maximum engine hours
  7. Quantity, delivery location and required date

Verified suppliers

We route your request to vetted equipment and materials suppliers, not random contacts.

One message, multiple quotes

Send your specification once on WhatsApp and get matched with relevant providers.

No obligation to buy

Compare pricing and availability from a supplier before you commit to anything.

Diesel or Gas?

  • Diesel sets are the default in Nigeria: fuel is easy to store and deliver, and a set can start anywhere
  • A gas set can cost less to run where pipeline gas, CNG or LNG is dependable, but it needs a gas supply and treatment, so confirm both before you switch
  • Many sites keep a diesel set as backup next to a gas set

Buying a FG Wilson 2000kVA Diesel Set in Warri

  • Warri sits in the Niger Delta oil and gas belt, so demand comes from oil service yards, marine logistics, onshore flow stations and petrochemical sites.
  • Sets are normally cleared through the Delta ports and trucked to site. Ask whether delivery includes offloading, because crane access varies by yard.
  • Confirm weight, footprint and lifting points on the data sheet, and plan a concrete plinth and crane or skid positioning at site

What to Check Before You Pay

  • Frequency (50Hz or 60Hz), voltage and phase on the rating plate, not only in the advert
  • Engine hours, service history and whether the set was prime or standby duty
  • A load-bank test at 75% load or more, with the readings recorded
  • Alternator insulation test, coolant and oil condition, and turbocharger condition
  • Fuel system condition, filters and injector service records
  • Control panel type, whether an ATS is included, and what the warranty covers

2000kVA FG Wilson Generator at a Glance (50Hz)

  • Real power at 0.8 power factor: about 1600 kW
  • Full-load current at 415 V three-phase: about 2782 A
  • Diesel use at 75% load: about 312 litres per hour (planning figure)
  • FG Wilson sets are built around Perkins and Cat-sourced diesel engines. Confirm the exact model and build year on the supplier's data sheet

Onshore and Offshore Use

  • Onshore: factories, estates, hospitals, malls, flow stations and processing plants, usually on 50Hz grid backup or prime power
  • Offshore and marine support: platform and vessel installations normally need a set built and certified to the platform's or vessel's class rules, and often 60Hz, so a standard onshore set is generally not enough
  • Tell us whether the set goes onshore or offshore when you ask, because it changes the frequency, enclosure and certification you need

50Hz or 60Hz in Warri

  • Nigeria's grid runs at 50Hz, so a set that backs up the grid or runs beside it has to be 50Hz
  • Some offshore and marine-support equipment around Warri is built to 60Hz. Confirm the frequency of the equipment you are powering before you choose.
  • A 60Hz set runs its engine at a higher speed (typically 1,800 rpm against 1,500 rpm at 50Hz) and is usually rated higher on the same engine, often by roughly 15 to 20 percent, so compare kVA ratings at the same frequency
  • A 60Hz set cannot feed a 50Hz network. Motors run fast and transformers can overheat unless a frequency converter is used

How to source 2000kVA FG Wilson Generator 50Hz/60Hz for Sale in Warri

  1. Send your requirement on WhatsApp

    Tell us what you need (2000kVA FG Wilson Generator 50Hz/60Hz for Sale in Warri), the quantity and your delivery location. One message is enough to start.

  2. We match you with relevant suppliers

    We route your request to independent suppliers who deal in this equipment and can serve your location.

  3. Compare quotes and buy direct

    Review pricing and availability from the supplier. Contracts, payment and delivery are agreed directly with them, with no obligation to buy.

Frequently Asked Questions

How much does a 2000kVA FG Wilson diesel generator cost in Warri?

We do not publish a fixed price, because it moves with frequency, new or used condition, engine hours, canopy, control panel, delivery to Warri and the exchange rate. Send your requirement on WhatsApp and we will get comparable quotes.

Is a FG Wilson 2000kVA generator 50Hz or 60Hz?

FG Wilson builds this size for both frequencies, and the rating differs between them. Nigeria's grid is 50Hz, so choose 50Hz for grid backup and choose 60Hz only when the equipment it powers is built for 60Hz.

How much diesel does a 2000kVA generator use?

Roughly 312 litres per hour at 75% load, or about 7488 litres over 24 hours. Actual use varies by engine, load and condition, so ask for the manufacturer's fuel curve for the exact model.

Can a 60Hz generator power Nigerian grid loads?

Not directly. A 60Hz set produces 60Hz output, so 50Hz motors run about 20 percent fast and transformers and sensitive electronics can be damaged. Use a frequency converter or choose a 50Hz set.

Can this generator be used offshore?

Offshore and marine installations normally need a set built and certified to the platform's or vessel's class rules, so a standard onshore set is generally not enough. Tell us the requirement and we will ask suppliers what they can certify.

Can you help me source one in Warri?

Yes. Tell us the frequency, new or used, quantity and site location on WhatsApp, and we will connect you with suppliers who can deliver to Warri.

Generators in our store

Real listings with specs. Request a quote or make an offer.

View all generators

Related Services & Equipment

Explore more

Same item in other cities

Other sizes in Warri

Other brands and types at this size in Warri

More specific equipment in Warri

Related buying routes

More equipment in Warri

More 2000kVA pages

Ready to get a quote?

Send your specification on WhatsApp now and we'll connect you with a relevant supplier, with no obligation to buy.

Suppliers across Nigeria, one message